2010 Construction Accomplishments:
2010 SWCD Completed Construction (total of 36
projects):
* Note: Click on photos to enlarge.
1)
5 Feedlot Runoff
fixes.
|
|
|
Feedlot - before
|
|
|
|
Feedlot - after
|
|
|
2)
5
Diversions/Waterways/Critical Area Plantings (new and repairs).
|
|
|
Grassed Waterway - before
|
|
|
|
Grassed Waterway - after
|
|
|
3)
17 Ponds /Grade
Stabilizers (new and repairs).
|
|
|
Grade Stabilizer - before
|
|
|
|
Grade Stabilizer - after
|
|
|
|
Pond repaire - before
|
|
|
|
|
Pond Repaire - after
|
|
|
|
Pond spillway repaire - before
|
|
|
|
Pond spillway repair - after
|
|
|
4)
6 Stream Bank
Stabilizations.
|
|
|
Streambank Stabilization site
|
|
|
|
Streambank Stabilization - Rock Rip-Rap installed, Erosion Matting installed, and Hydromulch being installed.
|
|
|
|
Streambank Stabilization completed.
|
|
|
5)
3 Native Buffer
projects (2007 flood repair and prairie plantings).
|
|
|
Native Buffer prairie planting seedlings.
|
|
|
|
Established prairie planting.
|
|
|
|
Established Prairie Planting.
|
|
|
|
|